Central Building, University of Nottingham (Castle Meadow Campus)

Refurbishment and renovation of the Grade II Listed former HMRC building. The building features state-of-the-art facilities and provides a social and commercial hub for Nottingham.

KEY ENVIRONMENTAL FEATURE
The original build featured a tensioned fabric roof and aluminium cladding, which was originally proposed to be replaced. The GFT team recognised this would generate excessive waste and high embodied carbon of new cladding. Working with our supply chain they came up with an alternative solution that refurbished the roof and cladding and saved 135tCO2e.

WE BUILD ON OUR EXPERIENCE

Site Map Accessibilty Privacy Policy Equality and Diversity Policy
Anti Modern Slavery Statement Covid Procedures Carbon Reduction Plan Join Our Mailing List Find Us

Copyright © G F Tomlinson Group Ltd 2026

Central Building, University of Nottingham - GF Tomlinson
Client: University of Nottingham Location: Nottingham Value: £12.0m

Design & Build

Central Building, University of Nottingham (Castle Meadow Campus)

Refurbishment and renovation of the Grade II Listed former HMRC building. The building features state-of-the-art facilities and provides a social and commercial hub for Nottingham.

KEY ENVIRONMENTAL FEATURE
The original build featured a tensioned fabric roof and aluminium cladding, which was originally proposed to be replaced. The GFT team recognised this would generate excessive waste and high embodied carbon of new cladding. Working with our supply chain they came up with an alternative solution that refurbished the roof and cladding and saved 135tCO2e.